Powerplant Harculo, Zwolle

Powerplant Harculo, Zwolle
In 2016, Koole BV started with the demolition of the Harculo power plant in Zwolle, The Netherlands. First phase of the project comprised the disassemblation of two large boilers. These boilers contained asbestos, which made it necessary for the disassemblation to be processed in containment. Resulting waste was, of course, properly disposed. Following this, the next phase of the project was the removal of the plant’s cauldron. The cauldron was...

GDF Suez Maxima-Centrale

GDF Suez Maxima-Centrale
The activities of the Maxima-Central were limited for some time, this resulted in the complete closure and remediation of the plant. KOOLE was contracted to decommission the power plant. Production units FL30 and FL32 and all surrounding buildings were completely dismantled. KOOLE was responsible for the entire project, from the initial preparation to making the terrain construction-ready.

Demolition of no longer operational Fluxys LNG reservoirs

Demolition of no longer operational Fluxys LNG reservoirs
Removal of two LNG tanks (diameter of approx. 50m) with all accompanying installations. Also extensive soil work performed.

CASES

Powerplant Harculo, Zwolle

Powerplant Harculo, Zwolle
In 2016, Koole BV started with the demolition of the Harculo power plant in Zwolle, The Netherlands. First phase of the project comprised the disassemblation of two large boilers. These boilers contained asbestos, which made it necessary for the disassemblation to be processed in containment. Resulting waste was, of course, properly disposed. Following this, the next phase of the project was the removal of the plant’s cauldron. The cauldron was...

GDF Suez Maxima-Centrale

GDF Suez Maxima-Centrale
The activities of the Maxima-Central were limited for some time, this resulted in the complete closure and remediation of the plant. KOOLE was contracted to decommission the power plant. Production units FL30 and FL32 and all surrounding buildings were completely dismantled. KOOLE was responsible for the entire project, from the initial preparation to making the terrain construction-ready.

Demolition of no longer operational Fluxys LNG reservoirs

Demolition of no longer operational Fluxys LNG reservoirs
Removal of two LNG tanks (diameter of approx. 50m) with all accompanying installations. Also extensive soil work performed.
KOOLE head office
Vijfhuizerdijk 110
2141 BD Vijfhuizen
The Netherlands
T +31(0)23 558 19 37

KOOLE nv
Vijfhuizerdijk 110
2141 BD Vijfhuizen
The Netherlands
T +31(0)23 558 19 37

KOOLE GmbH
Siemensstraße 31
47533 Kleve
Deutschland
T +49(0)28219773310

Call Now Button